Demo identity switcher. Authority is checked on the server for every decision, so switching roles here cannot approve a gate you do not hold.

TR-000003 Supercooled large droplet accretion on a swept wing section

IN SAFETY  ICE-1 — Icing Research Tunnel (elevated hazard)

Review progress

  1. Safety Review Awaiting decision
  2. Facility Readiness Review Not started
  3. Scheduling Confirmation Not started

Request detail

Principal investigator
H. Okonkwo
Organisation code
LTP-2
Requested window
2027-01-11 to 2027-01-29
Summary
Ice accretion runs across four droplet distributions to extend the SLD envelope for the swept-wing article, with laser sheet imaging of the runback region.
Hazard notes
Spray bar operation below freezing; de-icing fluids in use. Personnel access restricted during runs.

Your action

You hold Safety Review, and this request is waiting on it.

Decision

Recorded permanently against this request. Required for both outcomes.

Gate decisions

No decisions recorded yet.

Audit trail

Sequence intact. 2 events, sequence 1–2, no gaps.

Append–only activity log. The sequence number is unique per request, so a removed row is detectable.
#EventActor DetailRecorded
1 CREATED H. Okonkwo Request drafted for Supercooled large droplet accretion on a swept wing section. 2026-07-26 19:04
2 SUBMITTED H. Okonkwo Entered Safety Review. 2026-07-26 19:04

Machine-readable: JSON for TR-000003