Demo identity switcher. Authority is checked on the server for every decision, so switching roles here cannot approve a gate you do not hold.

Review queue

Every test request walks three gates in order — Safety Review, Facility Readiness Review, Scheduling Confirmation. A gate can only be decided by its own reviewer, and only when the request is actually sitting on it.

6 requests total
1 waiting on you (Safety Review)
2 fully approved
All test requests, newest first. The “Waiting on” column names the gate that must act next.
Request Facility Title Principal investigator Status Waiting on
TR-000006 MSL-2 Materials & Structures Lab Bay 2 Fatigue coupon screening, additively manufactured Inconel 718 T. Nakagawa MSD-9 APPROVED
TR-000005 DROP-132 Microgravity Drop Tower (132 m) Capillary flow in an irregular container geometry S. Vashisht MSD-3 DRAFT
TR-000004 ECTC-3 Engine Component Test Cell 3 Combustor liner thermal cycling to 2,000 cycles D. Marchetti MSD-7 RETURNED
TR-000003 ICE-1 Icing Research Tunnel Supercooled large droplet accretion on a swept wing section H. Okonkwo LTP-2 IN SAFETY Safety Review
TR-000002 EPVF-1 Electric Propulsion Vacuum Facility 1 12 kW Hall thruster erosion characterisation N. Beaumont MSD-11 IN SCHEDULE Scheduling Confirmation
TR-000001 SWT-8X6 Supersonic Wind Tunnel (8 x 6 ft) Inlet distortion survey, 1/6-scale nacelle A. Rutherford LTP-4 APPROVED