TR-000002 12 kW Hall thruster erosion characterisation
IN SCHEDULE EPVF-1 — Electric Propulsion Vacuum Facility 1 (critical hazard)
Review progress
- Safety Review Complete
- Facility Readiness Review Complete
- Scheduling Confirmation Awaiting decision
Request detail
- Principal investigator
- N. Beaumont
- Organisation code
- MSD-11
- Requested window
- 2027-03-15 to 2027-05-30
- Summary
- Long-duration wear test measuring discharge-channel erosion and plume divergence at three throttle points, with in-situ profilometry between segments.
- Hazard notes
- Xenon under pressure, 600 V discharge supply, and a beam dump reaching 700 K. Cryopanel regeneration is a controlled evolution.
Your action
No action available to you. This request is at Scheduling Confirmation; it cannot be decided at Safety Review.
The same check runs on the server when a decision is posted, so this is not merely a hidden button.
Gate decisions
| # | Gate | Decision | Reviewer | Rationale | Recorded |
|---|---|---|---|---|---|
| 1 | Safety Review | APPROVE | s.okafor | Hazard analysis reviewed against the facility safety permit. Controls are adequate as written. | 2026-07-26 19:04 |
| 2 | Facility Readiness Review | APPROVE | m.tran | Test cell configuration, instrumentation list and calibration records confirmed against the request. | 2026-07-26 19:04 |
Audit trail
Sequence intact. 4 events, sequence 1–4, no gaps.
| # | Event | Actor | Detail | Recorded |
|---|---|---|---|---|
| 1 | CREATED | N. Beaumont | Request drafted for 12 kW Hall thruster erosion characterisation. | 2026-07-26 19:04 |
| 2 | SUBMITTED | N. Beaumont | Entered Safety Review. | 2026-07-26 19:04 |
| 3 | GATE_APPROVED | s.okafor | Safety Review: APPROVE. | 2026-07-26 19:04 |
| 4 | GATE_APPROVED | m.tran | Facility Readiness Review: APPROVE. | 2026-07-26 19:04 |
Machine-readable: JSON for TR-000002