TR-000001 Inlet distortion survey, 1/6-scale nacelle

APPROVED  SWT-8X6 — Supersonic Wind Tunnel (8 x 6 ft) (elevated hazard)

Review progress

  1. Safety Review Complete
  2. Facility Readiness Review Complete
  3. Scheduling Confirmation Complete

Request detail

Principal investigator
A. Rutherford
Organisation code
LTP-4
Requested window
2027-02-08 to 2027-02-26
Summary
Steady and unsteady total-pressure survey at the aerodynamic interface plane across Mach 0.7 to 1.6, mapping distortion descriptors against angle of attack for the scaled nacelle.
Hazard notes
Compressed air to 450 psi. Model release path is contained by the existing catch screen.

Your action

No action available to you. This request is already approved and cannot be reviewed again.

The same check runs on the server when a decision is posted, so this is not merely a hidden button.

Gate decisions

Every decision ever taken on this request. Rows are append–only; nothing here is edited or deleted.
#GateDecision ReviewerRationaleRecorded
1 Safety Review APPROVE s.okafor Hazard analysis reviewed against the facility safety permit. Controls are adequate as written. 2026-07-26 19:04
2 Facility Readiness Review APPROVE m.tran Test cell configuration, instrumentation list and calibration records confirmed against the request. 2026-07-26 19:04
3 Scheduling Confirmation APPROVE k.whitfield Window confirmed against the facility calendar. No conflict with scheduled maintenance. 2026-07-26 19:04

Audit trail

Sequence intact. 5 events, sequence 1–5, no gaps.

Append–only activity log. The sequence number is unique per request, so a removed row is detectable.
#EventActor DetailRecorded
1 CREATED A. Rutherford Request drafted for Inlet distortion survey, 1/6-scale nacelle. 2026-07-26 19:04
2 SUBMITTED A. Rutherford Entered Safety Review. 2026-07-26 19:04
3 GATE_APPROVED s.okafor Safety Review: APPROVE. 2026-07-26 19:04
4 GATE_APPROVED m.tran Facility Readiness Review: APPROVE. 2026-07-26 19:04
5 GATE_APPROVED k.whitfield Scheduling Confirmation: APPROVE. 2026-07-26 19:04

Machine-readable: JSON for TR-000001